Wastewater Treatment Facility

Advanced Treatment Solutions

Treatment Methods

Physical/Chemical Treatment Method

A method that removes contaminants in wastewater by adding chemicals to induce physical and chemical reactions such as oxidation, reduction, and coagulation of organic/inorganic colloidal solids, heavy metals in dissolved state, and various pollutants.

  • Coagulation Sedimentation Method
  • Flotation Separation Method
Biological Treatment Method

A method that removes organic matter in wastewater using the biological decomposition action of microorganisms, efficiently reducing degradable organic substances.

  • Activated Sludge Process
  • Extended Aeration Method

Seongnam-Yeoju Bubal Vehicle Depot Wastewater Treatment Facility

Construction Period: December 22, 2014 ~ March 31, 2017

Project Name Seongnam-Yeoju Double Track Railway Bubal Vehicle Depot Construction
Method Physical-Chemical Treatment Method
Treatment Capacity - Sewage Treatment Facility (100 ton/day, Submerged Membrane)
- Wastewater Treatment Facility (50 ton/day, Ozone Oxidation)
Influent Source Subway train wash wastewater, vehicle depot domestic sewage
Influent Concentration Wastewater: BOD(200ppm), COD(200ppm), SS(230ppm)
Effluent Target - Below clean area discharge standards
- Wastewater: BOD(20ppm), COD(25ppm), SS(20ppm)
Seongnam-Yeoju Bubal Vehicle Depot Wastewater Treatment Facility

Bundang Seoul National University Hospital Wastewater Treatment Equipment

Construction Period: May 2, 2018 ~ March 31, 2019

Project Name Bundang Seoul National University Hospital Ji Seok-yeong Medical Research Institute Wastewater Treatment Facility
Method Physical-Chemical Treatment Method
Treatment Capacity 150 ton/day
Influent Wastewater Livestock excrement, laboratory reagents and washing sewage
Influent Concentration BOD(220ppm), COD(250ppm), SS(200ppm)
Effluent Target Below "Class B" area discharge standards
- BOD(120ppm), COD(130ppm), SS(200ppm)
Bundang Seoul National University Hospital Wastewater Treatment Equipment

Donghae Nambu Line Vehicle Depot Wastewater Treatment Facility

Construction Period: July 4, 2017 ~ December 31, 2018

Project Name Donghae Nambu Line Vehicle Depot Construction Wastewater Treatment Facility
Method Physical-Chemical Treatment Method
- Sewage Treatment Facility (Parallel Alternating Reactor)
- Wastewater Treatment Facility (Coagulation Sedimentation)
Treatment Capacity - Sewage Treatment Facility (150 ton/day, Parallel Alternating Reactor)
- Wastewater Treatment Facility (100 ton/day, Coagulation Sedimentation)
Influent Wastewater Subway train wash wastewater, vehicle depot domestic sewage
Influent Concentration Wastewater: BOD(250ppm), COD(208ppm), SS(259ppm)
Effluent Target Below "Class A" area discharge standards
Wastewater: BOD(4ppm), COD(15ppm), SS(3ppm)
Donghae Nambu Line Vehicle Depot Wastewater Treatment Facility